Getting the boat ready

We arrived midday on Wednesday 9th May to a sunny Sukosan. The drive through from Slovenia to Zagreb and down to Zadar was an easy breeze. We found Deja Vu II waiting for us on her cradle in the compound, ready antifouled and polished.

deja vu May 10th 2012
Deja Vu II May 10th as we found her

 

Nigel had a list of jobs that seemed endless, a lot of them routine when starting the season. They ranged from checking all the seacocks, mounting the new anchor, installing a new GPS aerial (the old one was damaged), checking out the house batteries – we discovered we needed to replace them, fixing the aircon pump, replacing radio plugs – to name but a few.

 

 

Air con repairs
Nigel installing new Air con pump

 

We had had problems with parts of the teak decks where some of the rubber strips had deteriorated (old age) and become sticky so needed replacing. We spent a while ourselves digging out the old rubber with special tools Nigel had brought from the UK, but it was soon clear we needed the help of the very efficient professionals. What a relief to hand that job over! Here it is filled and curing before cleaning up..we hope it produce a great result!

recaulking the stern deck

Recaulking the stern deck

 

 

 

 

Most of this work has been done in fantastic weather, temperatures in the high 20’s, touching 31 degrees C on Saturday. Sunday marked a change with well-forecast gales and storms and the temperature plummeting to 11 degrees.  We are booked to be launched early on Tuesday 15th and we are hoping for an improvement to the weather.

 

electrics
Fun in the wiring department
new batteries
New batteries

Leave a comment